Active — held — the record stands behind it.
6 of 7 CLAIM documents. Back to the full index.
| # | Title | Summary | Status |
|---|---|---|---|
| CLAIM-001 | Traffic on the bridge has doubled since 2020 | Active | |
| CLAIM-002 | The load rating has not changed | Active | |
| CLAIM-003 | The bridge now carries loads near its rating | Active | |
| CLAIM-004 | Freeze–thaw accelerates damage to a heavily loaded deck | Active | |
| CLAIM-005 | The bridge should be repaired before winter | Active | |
| CLAIM-007 | The last inspection found no cracking | Active |